Commit graph

2 commits

Author SHA1 Message Date
Claude
5f00628dfe Update the workflow map to what is actually running
Read from the running containers on 2026-08-28, not from the plan.

Both AI steps move from "stood in for" to running: the model account arrived
on 27 August, the dropdown and the placeholder wording are gone, and the
documents are indexed so search works by meaning. Two of the three items in
section 3a are now closed; the historian login is the only blocker left.

The map records what switching the model on cost, because that is the part
worth telling somebody who was not here: five faults inside an hour, every one
hidden by the stand-in that replaced the model. The interlock finding is
written out in full - the assistant was handing the answer writer the step list
while withholding the title block - because it is the one a safety reviewer
should see.

The Unclear lane no longer says it cannot be exercised. It was, by the
zero-confidence fault, and it failed to the cautious side, which is how it was
designed to fail.

The model-account card stays honest about the small deployment that was asked
for and not provided: labelling runs on the flagship model, works correctly,
and costs about ten times the estimate per question.

Note: this file already carried uncommitted changes from a previous session.
Those are included here and have not been separately reviewed.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-28 10:54:49 +10:00
Claude
189f528d47 Add the plain-language workflow map
A single-page explainer for people who will not read the build spec: how a
question becomes an answer, the four lanes and why they are separate, the four
tools the assistant may reach for, where the knowledge comes from, and what is
live against what is only built. Status snapshot as observed on the host,
21 August 2026.

Kept at the repository root beside the other narrative documents rather than in
docs/, which is gitignored and holds controlled plant documents. Listed in the
layout sections of README.md and the build spec so it is findable.

Note: it predates Phase 9 and so does not mention operator document upload,
withdrawal or pool curation. Its step table stops at 8.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-21 13:19:45 +10:00