Build spec and host brief carried in from C:\Claude and WRPS/02-env; the plant model (equipment, tags, alarm bitmask, enums, unit conversions) is derived from WRPS/04-plc/register-map.csv, WRPS/05-scada/modbus/scada-points.csv and WRPS-CTL-003. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2 KiB
2 KiB
| 1 | equipment_id | display_name | aliases | equipment_type | unit_name | description |
|---|---|---|---|---|---|---|
| 2 | STN-001 | Waterloo Road Pump Station | Waterloo Road|Waterloo Rd|WRPS|the station|pump station|the pump station|station|Waterloo Road PS | station | WRPS | Three-pump wastewater pump station. Duty/assist/assist on a common VSD speed reference. Controlled by openplc-runtime; historised by CI Server on cicore1. |
| 3 | WW-101 | Wet Well | wet well|wetwell|the well|the wet well|well|sump|the sump|WW101|WW-101 | vessel | WRPS | Wet well. 0-7000 mm working range, 120 m3 per metre of level. Spill weir crest 6000 mm; LSHH 5500 mm; stop-all 1000 mm. |
| 4 | PU-301 | Pump 01 | Pump 01|Pump 1|pump one|pump1|P1|P-301|PU301|PU-301|number 1 pump|no 1 pump|first pump | pump | WRPS | Submersible wastewater pump 1 of 3. Approx 120 L/s at duty against 22 m static lift. VSD driven from the common station speed reference. |
| 5 | PU-302 | Pump 02 | Pump 02|Pump 2|pump two|pump2|P2|P-302|PU302|PU-302|number 2 pump|no 2 pump|second pump | pump | WRPS | Submersible wastewater pump 2 of 3. Approx 120 L/s at duty against 22 m static lift. VSD driven from the common station speed reference. |
| 6 | PU-303 | Pump 03 | Pump 03|Pump 3|pump three|pump3|P3|P-303|PU303|PU-303|number 3 pump|no 3 pump|third pump | pump | WRPS | Submersible wastewater pump 3 of 3. Approx 120 L/s at duty against 22 m static lift. VSD driven from the common station speed reference. |
| 7 | MAN-301 | Discharge Manifold | manifold|the manifold|discharge manifold|common manifold|rising main|MAN301|MAN-301 | piping | WRPS | Common discharge manifold collecting all three pumps into the rising main. 22 m static lift to the receiving point. |
| 8 | WEIR-105 | Spill Weir | weir|the weir|spill weir|overflow|overflow weir|spill point|WEIR105 | structure | WRPS | Overflow weir. Crest at 6000 mm wet well level. A spill is an environmental reportable event - LSH-104 detects it. |
| 9 | MCC-501 | Main Switchboard | switchboard|the switchboard|MCC|main switchboard|mains|mains supply|MCC501|MCC-501 | electrical | WRPS | Station main switchboard and mains supply. Healthy status monitored by XA-502. |