Phase 5: I/O processes, equipment and ITEM Service; authorization and equipment skills #5

Merged
cliu merged 4 commits from docs/phase-5-io-items into main 2026-09-30 17:29:48 +10:00

4 commits

Author SHA1 Message Date
79c0bfa848 Record Modbus mirror start via tls\com after restart
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 17:26:17 +10:00
90058ffdef Add equipment skill and Modbus loopback station to CI-Eng-Sample
- New skill equipment with task modbus-station: line, station, scan type,
  points and connected items by quick load, tested against CI Server's own
  Modbus slave mirror (eqpmdcmem + eqpmdcslvtcp)
- CI-Eng-Sample: section PLC1, station CIENG_PLC with write/read-back
  items, load/remove steps and mirror start/stop scripts
- ISS-024: the TCP slave answers Open Modbus/TCP, not RTU (closed)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 17:22:58 +10:00
f24e617a70 Add phase 5 equipment and ITEM Service summaries
- Summaries of IM 36K10L40 (EQUIPMENT utilities), L41 (EQUIPMENT
  configuration: lines, stations, conversion types, Modbus master/slave,
  driver table), L35 (ITH) and L36 (ITM), checked against the installed
  start scripts, setup files and datasets
- tuning-checks: read-only itmdbg / eqpdbg via piped answers
- New ISS-021 (STATION_STAT empty), ISS-022 (itmval -f crashes),
  ISS-023 (install differs from ITEM manuals, closed); ISS-006 updated

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 17:15:14 +10:00
ef543cde20 Add phase 5 Engineering Module summary, authorization skill, item tests
- Summary of IM 36K10C10 (Engineering Module - I/O Processes), checked
  against dssana.sup, itm.sup and the default datasets
- New skill authorization: users and authorization groups by quick load
- item-engineering: string item limits (1-200, holds length - 1) and the
  integration granule (itm_int_secs), both tested on CI-Eng-Sample
- CI-Eng-Sample: read-only authorization group CIENG_VIEWER
- Closed ISS-001 (uoff/ublk option bits), ISS-010, ISS-019; new ISS-018, ISS-020

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 17:09:45 +10:00