Summarize the Release Information (known issues) and System Design/Management manuals, add the system-check and system-management skills practiced on the R1.03 test system, and add the progress tracker, issue register and a CI-Eng-Sample placeholder. CLAUDE.md now requires a version check, asks once per conversation whether to work directly or prepare files only, and treats the manuals as development-only. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
5.6 KiB
Progress
Status of each manual and each practiced task. Update this file as work proceeds.
Manual status: not started · summarized · in practice · done Task status: not practiced · practiced, awaiting confirmation · passed · not completed (see notes)
Test system
Practice notes refer to the repo author's development test system, not to anything shipped with this repo:
- CI Server R1.03.00, unlicensed, on the development machine.
- AID (e.g.
AID.WRPS.SIM.INFLOW) is the author's own test project on that machine. It is not in this repo and other systems will not have it. Item names here are evidence of what was tested, not names to use elsewhere. - Communication stations seen there (
WRPS_PLC,MODSIM_STATION,STN_MQTT) belong to AID.
Shared, repeatable practice will use the sample project CI-Eng-Sample
(examples/CI-Eng-Sample/) once it exists.
Manuals, in working order
| Phase | Manual | Title | Status |
|---|---|---|---|
| 0 | IM 36K01A50 | Release Information | summarized (notes) |
| 1 | IM 36K10J10 | System Design/Management | in practice, skill system-management (notes) |
| 2 | IM 36K01C10 | CI Server Setup | not started |
| 2 | IM 36K01C30 | Security Guide | not started |
| 3 | IM 36K10G10 | Tutorial | not started |
| 4 | IM 36K10R10 | CI Portal Setup | not started |
| 4 | IM 36K10R20 | Setup File Editor | not started |
| 5 | IM 36K10C10 | Engineering Module - I/O Processes | not started |
| 5 | IM 36K10L40 | EQUIPMENT Service - Utilities | not started |
| 5 | IM 36K10L41 | EQUIPMENT Service - Configuration | not started |
| 5 | IM 36K10L35 | ITEM Service - ITH | not started |
| 5 | IM 36K10L36 | ITEM Service - ITM | not started |
| 6 | IM 36K10L10 | Class/Object Engineering | not started |
| 6 | IM 36K10P10 | Class Description Language - Traditional | not started |
| 6 | IM 36K10P11 | Class Description Language - Java | not started |
| 7 | IM 36K10L55 | Exchange Tool Engineering | not started |
| 7 | IM 36K10L30 | BUS Service | not started |
| 7 | IM 36K10L45 | Data Access Engineering | not started |
| 7 | IM 36K10E20 | OPC Interface | not started |
| 8 | IM 36K10L15 | Alarm Management Engineering | not started |
| 8 | IM 36K10C20 | Engineering Module - Alarms | not started |
| 8 | IM 36K10E30 | Alarm System Performance Analysis | not started |
| 9 | IM 36K10L20 | History Management Engineering | not started |
| 9 | IM 36K10C40 | Engineering Module - Historical | not started |
| 10 | IM 36K10R30 | Graphic Display Setup | not started |
| 10 | IM 36K10C50 | Edit Module | not started |
| 10 | IM 36K10C60 | Advanced Operating Graphics | not started |
| 11 | IM 36K10L50 | Data Set Service Engineering | not started |
| 11 | IM 36K10P30 | Data Set Service Language | not started |
| 11 | IM 36K10P20 | Report Generation Language | not started |
| 11 | IM 36K10R40 | Report Server Setup | not started |
| 11 | IM 36K10C30 | Engineering Module - Reporting | not started |
| 11 | IM 36K10E10 | Excel Add-in | not started |
| 12 | IM 36K10L25 | Audit Trail Management | not started |
| 13 | IM 36K10J20 | High Availability Computing | not started (needs two servers) |
| 13 | IM 36K10J40 | Active Directory Integration | not started (needs a domain) |
| — | IM 36K01A10 / A20 / A30 | Read Me First, License, OSS terms | skipped (no engineering content) |
Order change after reading IM 36K10J10: its migration procedure (§5.6) shows the dependency chain communication lines/stations/points → installations/units → items (template items first) → storage groups → classes → objects → reports. So acquisition and items (phase 5) now come before classes and objects (phase 6), and the other interfaces follow as phase 7.
Tasks
| Manual | Task | Status | Notes |
|---|---|---|---|
| J10 | System check: version, paths, running state, time sync (skill) | passed | Started CI Service elevated; live version R1.03.00; node UNLICENCED (expected). |
| J10 | Time sync check / configuration (w32tm, durutl.sup) |
not practiced | Check only on this system; no Vnet/IP. |
| J10 | Export a dataset with dssqld (task) |
passed | Filter-file syntax: ISS-003. |
| J10 | Import / update a dataset with dssqld |
not practiced | Writes to the database; ask first. |
| J10 | Read an item with itmval -g |
passed | Read AID.WRPS.* items. -a 1..5 gave ITM-E-WRONG_ATT on an item without limits: ISS-004. |
| J10 | Write an item with itmval -p |
practiced, awaiting confirmation | AID.WRPS.SIM.INFLOW 419.76 → 400 → 419.76. After the first write the item's options gained the uoff flag (0x8a → 0x8e), which stays after restoring the value. See ISS-001. |
| J10 | Read the message log (tls\log\umhlog.log) |
passed | |
| J10 | Per-component version list (tls\lst\tls_versions.lst) |
passed | |
| J10 | Load history from CSV with ithloahis |
not practiced | Needs an item storage group. |
| J10 | Consistency check (dsschk, ismchk) |
not completed | dsschk -d ITEM_DF -v exits 0 with no output and nothing new in the message log; See ISS-002. |
| J10 | Monitoring processes (intmon, intcpumon, intdskmon, inttcpmon, intspawn) |
not practiced | Needs items to report into; better after phase 5. |
| J10 | Backup of tls folders |
not practiced | Plan only; the actual backup tool is site-specific. |
| J10 | Migration between systems (§5.6) | not practiced | Needs engineered data; revisit after phase 6. |
| J10 | Tuning and debugging (setup files, *_debug launchers, debuggers) |
not practiced |