2025-11-05 - 2026-11-05
Overview
1 release published by 1 user
Tag
r1.03-final
35 pull requests merged by 1 user
Merged
#35 R1.05 findings from a user project (tested only)
Merged
#34 R1.05: mark V7, V8, V11, V13, V17 as not tested (deferred by the user)
Merged
#33 R1.05 V16: MAX_UI_PER_CLIENT default 5, test server 500 after a later save
Merged
#32 R1.05 V5 and V6: graphics files and history checks on the test server
Merged
#31 R1.05 V14: OPCJEXE does not answer opcdbg performance requests
Merged
#30 R1.05 write tests V9, V10, V12, V15 on the shared test server
Merged
#29 R1.05 re-check batch 3: alarms, audit, authorization, classes, HAC, reporting, pyTOOLS
Merged
#28 R1.05 re-check batch 2: graphics, history, portal, system-management, items
Merged
#27 R1.05 re-check: installation-security, data-access, equipment
Merged
#26 Move main to CI Server R1.05: version split, differences, system check
Merged
#25 README: repo renamed to ci-server-engineer
Merged
#24 Sample operator HMI (CIENG_* displays, layouts, user CIENG, live-data feed) and tested findings ISS-068..075
Merged
#23 Layouts: every Layouts.xml parameter tested on desktop and web
Merged
#22 README: manuals are only needed to extend the repo
Merged
#21 RDBMS data exposure to SQL Server (tested in R1.05 only)
Merged
#20 Phase 14e: Custom time range, 3D orthogonal and CSS render modes
Merged
#19 Phase 14d: Micro Trend item names connected (ISS-055 cause 1)
Merged
#18 Phase 14c: CIENG_Tank trend padded so it draws in the HTML display
Merged
#17 Phase 14b: Web check of each trend setting
Merged
#16 Phase 14: Trend settings (desktop and web) and the HTML trend fix
Merged
#15 Phase 13: High availability and Active Directory
Merged
#14 Issue review after phase 12
Merged
#13 Phase 12: Audit trail
Merged
#12 Phase 11: Data Set Service and reporting
Merged
#11 Phase 10b: Operator Interface layouts
Merged
#10 Phase 10: Graphic Display Setup, Edit Module, Advanced Operating Graphics
Merged
#9 Phase 9: History Management Engineering, Engineering Module - Historical
Merged
#8 Phase 8: Alarm Management, Engineering Module - Alarms, Alarm System Performance Analysis
Merged
#7 Phase 7: BUS Service, Data Access (OPC UA/DA/A&E, ODBC), OPC Interface, Exchange tools
Merged
#6 Phase 6: PROCESS Service classes and objects (L10, P10, P11)
Merged
#5 Phase 5: I/O processes, equipment and ITEM Service; authorization and equipment skills
Merged
#4 Phase 4: CI Portal setup, Setup File Editor, portal-setup skill
Merged
#3 Phase 2-3: setup/security, Tutorial, new item and class/object skills
Merged
#2 Phase 0-1: system management skills and CI-Eng-Sample project
Merged
#1 Add CI Server document map and repo structure